MTS-PILOT

A MODERN CONSTRUCTION SITE

MTS-CAD
DATA PREPARATION
  • Ability to create construction maps independently
  • Visualization of channels and pipes as 3D lines
  • Creation of digital terrain models based on measurement data and point clouds, verification, and supplementation of existing planning materials
  • Detection of design errors before halting construction work
  • Facilitating management by utilizing length, area, and volume measurements during construction work
  • Utilization of length, area, and volume for complete and controlled computational data
MTS-NAVI
EXCAVATOR + BULLDOZER
  • Excavator navigation system
  • Precise guidance of the excavator bucket along the digital terrain model or line
  • Instant availability of all information regarding the current construction situation
  • Accurate representation of excavation bottom, embankment, and trench
  • Clear visualization of channel and street axes or roadway edges
  • Elimination of leveling
  • No need for stakes and safeguards
  • Excavation and embankment layer assistant as practical tools
MTS-CAD
MEASUREMENTS
  • Elimination of preliminary staking by a surveyor
  • Possibility for workers to place stakes independently at a chosen time
  • Option to print measurements
  • Extended staking functions such as indirect measurements
  • Precise terrain measurement allows for accurate determination and allocation of transferred soil
  • Precise documentation of each work step and ensuring completeness of settlement documentation
MTS-NAVI
EMBANKMENT LAYER ASSISTANT
  • Determination and maintenance of the correct embankment height
  • Graphical representation of embankment height on the excavator’s computer
COMPACTION COMPLETION SIGNAL AND PROTOCOL DISPLAY
  • Measurement performed by the compactor and notification of compaction process completion
  • Display of message and protocol on the excavator’s computer
BEARING CAPACITY CONTROL
  • Control measurement using a lightweight HMP measuring module
  • Transfer of Evd values to construction data with an accuracy of 1 cm
  • PDF reports and presentation of curves or measurement points on the construction plan

OPTIMISATION OF THE CONSTRUCTION PROCESS

  • Comprehensive planning – execution – settlement – documentation
  • Continuous position and height control
  • Precision and quality control
  • Integration with automatic technologies (MTS-VA)
  • Adaptation to BIM standards

REDUCED MEASUREMENT EFFORT

  • Completion of measurements before the start of construction work
  • Immediate detection of errors and design deficiencies

SPEEDING UP CONSTRUCTION WORK

  • High efficiency
  • Short downtime
  • Independent work of the excavator operator
  • Elimination of insufficient/excessive soil removal

HIGHER LEVEL OF OCCUPATIONAL SAFETY

  • Excavator access to hard-to-reach areas, even at a depth of 5 m

GAINING NEW MARKET OPPORTUNITIES

  • Possibility of performing construction work that would be unprofitable without 3D excavator control