3D DATA PREPARATION
The digitisation of construction documentation makes it possible to eliminate piling and move this operation to the office. This reduces staff involvement and ensures that construction work is carried out quickly and efficiently. Such benefits are only possible with high quality planning data.
OUR SUPPORT INCLUDES:
- CONSULTATIONS
- TRAINING
- CONTENT CONTROL
- DATA PROCESSING

Every hour invested in the correct preparation of data reduces tedious measurements and significantly speeds up the progress of construction work.
EXAMPLES OF APPLICATION

- Acquisition of current REB field data and comparison with existing 2D ground plan (DXF)
- Designation of construction work area 2 projects for excavator
TIME-CONSUMING APPROX. 4 HOURS

- Use of existing REB-DGM data and preparation of existing 2D ground plan (DXF)
- Earth excavation for soil retention filters 1 project for excavator
TIME-CONSUMING APPROX. 2.5 HOURS

- Completion of a comprehensive DGM of the digitised data in-house (from paper records of 7000 points)
- Labour-intensive cascades and pile-ups 5 projects for the excavator
TIME-CONSUMING APPROX. 25 HOURS
DATA QUALITY
The suitability of the navigation system depends on the maps used. The same principle applies to the 3D control of the excavator. Here, too, the suitability of the digital terrain models depends on the quality of the underlying data. Only the highest data quality guarantees the efficiency and profitability of construction work.